http://www.riversidegardens.org/avsapps/content/default.asp?sid=159
Monday, September 06, 2010
Watch Us Grow -- PHOTOS
|
Site provided by |
View construction photos at the garden site. Section ContentThe site for the garden before any excavation. The kickoff at the garden site. Excavation begins Looking west towards the river. Constructing the mold for concrete for the Chinese bridge. Pictured are Jim Lewis (right), RIFG designer, and Russ Brunk from Crest Precast Concrete in La Crescent. Crest Prescast Concrete of La Crescent installs posts that will support the fence around the Chinese Garden. Once the posts are in place, prefabricated concrete panels will be installed, connecting all posts with the except for the Moon Gate opening. Decorative wrought iron will be installed on top of the fence this fall, as well as “crown” pieces on top of the posts |
